There are multiple tool event types from the POR Schedule. However, there is a mapping in LSPx to categorise them into three main categories [Install, Demo and Convert in Place (CIP)]. The table below shows all the event types from POR and its category in LSPx. To ensure that DACs can be created for all necessary events, below is a simple rule for determining the type:
- If "Install" is in the word, use the Install form.
- If "Demo" is in the word, use the Demo form.
- If "Conv", "Qual/Qual-Fac" or "Upgrade/Upgrade-Fac" is in the word, use Convert in Place (CIP) form.
Mapping (POR Schedule vs LSPx)
# | Event Type from POR Schedule | Event Type in LSPx |
---|---|---|
1 | Conv | Convert in Place (CIP) |
2 | Conv - Stop Work | Convert in Place (CIP) |
3 | Conv-Fac | Convert in Place (CIP) |
4 | Conv-Fac - Stop Work | Convert in Place (CIP) |
5 | Conv-Fac-Rename | Convert in Place (CIP) |
6 | Conv-Rename | Convert in Place (CIP) |
7 | Demo | Demo |
8 | Demo - Stop Work | Demo |
9 | Harvest | N/A |
10 | HDQ | N/A |
11 | Install | Install |
12 | Install - Stop Work | Install |
13 | Install-Conv | Convert in Place (CIP) |
14 | Install-Conv - Stop Work | Convert in Place (CIP) |
15 | Install-Conv-Rename | Convert in Place (CIP) |
16 | Install-Conv-Rename-Stop Work | Convert in Place (CIP) |
17 | Install-Rename | Install |
18 | Install-Rename - Stop work | Install |
19 | Qual | Convert in Place (CIP) |
20 | Qual - Stop Work | Convert in Place (CIP) |
21 | Qual-Fac | Convert in Place (CIP) |
22 | Qual-Fac - Stop Work | Convert in Place (CIP) |
23 | Qual-Fac-Rename | Convert in Place (CIP) |
24 | Stop Work - Conv | Convert in Place (CIP) |
25 | Stop Work - Conv-Fac | Convert in Place (CIP) |
26 | Stop Work - Demo | Demo |
27 | Stop Work - Install | Install |
28 | Stop Work - Install-Conv | Convert in Place (CIP) |
29 | Stop Work - Install-Conv-Rename | Convert in Place (CIP) |
30 | Stop Work - Install-Rename | Install |
31 | Stop Work - Qual | Convert in Place (CIP) |
32 | Stop Work - Qual-Fac | Convert in Place (CIP) |
33 | Stop Work - Upgrade | Convert in Place (CIP) |
34 | Upgrade | Convert in Place (CIP) |
35 | Upgrade - Stop Work | Convert in Place (CIP) |
36 | Upgrade-Fac | Convert in Place (CIP) |
37 | Upgrade-Fac - Stop Work | Convert in Place (CIP) |