Record of Discussion

List

Below is a list of all the ROD Types that have been approved by Intel for LSPx. The ROD Type that you see will depend on your Site, Role Type and Affects.

N1 - Non-Valid ROD does not fall into any workflow. N1 is always be available to the AEs throughout the transition process. Once chosen, the workflow will continue as normal without jumping any status.

IDAffectsROD TypeROD FromROD ToSiteWorkflowDescriptionCategory
1ToolC1 - POC Change RequestTradeAERonler Acres, Aloha, Arizona, Chandler, Rio Rancho2.1 Workflow (ROD)Request or notification to change a Mechanical, Electrical, Comms or LSS POC for Tool InstallConstruction Deviation Request
2ToolC1 - POC Change RequestTradeIntegrationOther Sites (that exist in system today)2.2 Workflow (ROD)Request or notification to change a Mechanical, Electrical, Comms or LSS POC for Tool InstallConstruction Deviation Request
3ToolC1 - POC Change RequestAEIntegrationAll Sites2.3 Workflow (ROD)Request or notification to change a Mechanical, Electrical, Comms or LSS POC for Tool InstallConstruction Deviation Request
4ToolC1 - POC Change RequestIntegrationAERonler Acres, Aloha, Arizona, Chandler, Rio Rancho2.6 Workflow (ROD-Instruction)Request or notification to change a Mechanical, Electrical, Comms or LSS POC for Tool InstallConstruction Deviation Request
5ToolC1 - POC Change RequestAETradeRonler Acres, Aloha, Arizona, Chandler, Rio Rancho2.4 Workflow (ROD-Instruction)Request or notification to change a Mechanical, Electrical, Comms or LSS POC for Tool InstallConstruction Deviation Request
6ToolC1 - POC Change RequestIntegrationTradeOther Sites (that exist in system today)2.5 Workflow (ROD-Instruction)Request or notification to change a Mechanical, Electrical, Comms or LSS POC for Tool InstallConstruction Deviation Request
7ToolC2 - Popout Change RequestTradeAEAll Sites2.1 Workflow (ROD)Request or notification to change a Popout assignment for Tool InstallConstruction Deviation Request
8ToolC2 - Popout Change RequestAEIntegrationRonler Acres, Aloha, Arizona, Chandler, Rio Rancho2.3 Workflow (ROD)Request or notification to change a Popout assignment for Tool InstallConstruction Deviation Request
9ToolC2 - Popout Change RequestAETradeAll Sites2.4 Workflow (ROD-Instruction)Request or notification to change a Popout assignment for Tool InstallConstruction Deviation Request
10ToolC2 - Popout Change RequestIntegrationAERonler Acres, Aloha, Arizona, Chandler, Rio Rancho2.6 Workflow (ROD-Instruction)Request or notification to change a Popout assignment for Tool InstallConstruction Deviation Request
11ToolC3 - ECR Change RequestTradeAEAll Sites2.1 Workflow (ROD)Request or notification to change an ECR.Construction Deviation Request
12ToolC3 - ECR Change RequestAETradeAll Sites2.4 Workflow (ROD-Instruction)Request or notification to change an ECR.Construction Deviation Request
13ToolC4 - I&C-LSS-Telecom Points Change RequestTradeAERonler Acres, Aloha, Arizona, Chandler, Rio Rancho2.1 Workflow (ROD)Request or notification to change a I&C, LSS or Telecom POC for Tool InstallConstruction Deviation Request
14ToolC4 - I&C-LSS-Telecom Points Change RequestTradeIntegrationOther Sites (that exist in system today)2.2 Workflow (ROD)Request or notification to change a I&C, LSS or Telecom POC for Tool InstallConstruction Deviation Request
15ToolC4 - I&C-LSS-Telecom Points Change RequestAETradeRonler Acres, Aloha, Arizona, Chandler, Rio Rancho2.4 Workflow (ROD-Instruction)Request or notification to change a I&C, LSS or Telecom POC for Tool InstallConstruction Deviation Request
17Tool / PedestalC5 - Material or line size change requestTradeAEAll Sites2.1 Workflow (ROD)Request or notification to change material or line size due to field conditions or unexpected obstacles encountered during Design. Material availabilityConstruction Deviation Request
18Tool / PedestalC5 - Material or line size change requestAETradeAll Sites2.4 Workflow (ROD-Instruction)
19Tool / PedestalC6 - Deviation from criteriaTradeAEAll Sites2.1 Workflow (ROD)Request or notification to deviate from RP design criteria other than C5 (Material or Line size request)Construction Deviation Request
20Tool / PedestalC6 - Deviation from criteriaAETradeAll Sites2.4 Workflow (ROD-Instruction)
21ToolC7 - RoxtecTradeAERonler Acres, Aloha, Arizona, Chandler, Rio Rancho2.1 Workflow (ROD)Request or notification to change a Roxtec assignment for Tool InstallConstruction Deviation Request
22ToolC7 - RoxtecTradeIntegrationOther Sites (that exist in system today)2.2 Workflow (ROD)
23ToolC7 - RoxtecAEIntegrationRonler Acres, Aloha, Arizona, Chandler, Rio Rancho2.3 Workflow (ROD)Request or notification to change a Roxtec assignment for Tool InstallConstruction Deviation Request
24ToolC7 - RoxtecAETradeAll Sites2.4 Workflow (ROD-Instruction)Request or notification to change a Roxtec assignment for Tool InstallConstruction Deviation Request
25ToolC7 - RoxtecIntegrationTradeOther Sites (that exist in system today)2.5 Workflow (ROD-Instruction)Request or notification to change a Roxtec assignment for Tool InstallConstruction Deviation Request
26ToolC7 - RoxtecIntegrationAERonler Acres, Aloha, Arizona, Chandler, Rio Rancho2.6 Workflow (ROD-Instruction)Request or notification to change a Roxtec assignment for Tool InstallConstruction Deviation Request
27ToolC8 - Layout change RequestTradeAEAll Sites2.1 Workflow (ROD)Request or notification to change a tool or component location.Construction Deviation Request
28ToolC8 - Layout change RequestAETradeAll Sites2.4 Workflow (ROD-Instruction)Request or notification to change a tool or component location.Construction Deviation Request
29ToolC9 - Tray Change RequestTradeAEAll Sites2.1 Workflow (ROD)Request or notification to change size or location of electrical cable tray.Construction Deviation Request
30ToolC9 - Tray Change RequestAETradeAll Sites2.4 Workflow (ROD-Instruction)Request or notification to change size or location of electrical cable tray.Construction Deviation Request
31ToolC9 - Tray Change RequestAEIntegrationAll Sites2.3 Workflow (ROD)Request or notification to change size or location of electrical cable tray.Construction Deviation Request
32ToolC10 - Electrical Routing SubmissionTradeAEAll Sites2.1 Workflow (ROD)Notification by electrical trade of routing or cable lengths.SDD
33ToolC10 - Electrical Routing SubmissionAETradeAll Sites2.4 Workflow (ROD-Instruction)Notification by electrical trade of routing or cable lengths.SDD
34Tool / PedestalD1 - AE Error and OmissionTradeAEAll Sites2.1 Workflow (ROD)Notification to advise of change in design criteria due to an AE error or omissionClarification
35Tool / PedestalD1 - AE Error and OmissionAETradeAll Sites2.4 Workflow (ROD-Instruction)Notification to advise of change in design criteria due to an AE error or omissionClarification
36Tool / PedestalD2 - RP ErrorTradeAEAll Sites2.1 Workflow (ROD)RP errors or conflicts within the RPClarification
37Tool / PedestalD2 - RP ErrorAETradeAll Sites2.4 Workflow (ROD-Instruction)RP errors or conflicts within the RPClarification
38Tool / PedestalD3 - QA/QC requested clarificationTradeAEAll Sites2.1 Workflow (ROD)QA request a ROD to allow them to signoff an error or omission in the package that they find.Clarification
39Tool / PedestalD3 - QA/QC requested clarificationAETradeAll Sites2.4 Workflow (ROD-Instruction)QA request a ROD to allow them to signoff an error or omission in the package that they find.Clarification
40Tool / PedestalN1 - Non-Valid RODAETradeAll SitesThis is not a workflow. N1 must always be available to the the AEs throughout the transition process ONLYNot a valid ROD. Categorized by SI or AENon-Valid ROD
41Tool / PedestalN1 - Non-Valid RODAEIntegrationAll SitesThis is not a workflow. N1 must always be available to the the AEs throughout the transition process ONLYNot a valid ROD. Categorized by SI or AENon-Valid ROD
42Tool / PedestalO1 - Tool Owner RequestTradeAEAll Sites2.1 Workflow (ROD)Request or notification of change driven by TO requestScope Change/Add
43Tool / PedestalO1 - Tool Owner RequestAETradeAll Sites2.4 Workflow (ROD-Instruction)Request or notification of change driven by TO requestScope Change/Add
44ToolO2 - RP Update/RPATradeAEAll Sites2.1 Workflow (ROD)Request or notification of change driven by RP update during design/detailing/constructionScope Change/Add
45ToolO2 - RP Update/RPAAETradeAll Sites2.4 Workflow (ROD-Instruction)Request or notification of change driven by RP update during design/detailing/constructionScope Change/Add
46Tool / PedestalO3 - BB/LOD DrivenAETradeAll Sites2.4 Workflow (ROD-Instruction)Change request or notification driven by scope addition or removal by BB/LODScope Change/Add
47Tool / PedestalO4 - Vendor/Supplier IssueTradeAEAll Sites2.1 Workflow (ROD)Equipment supplied, not as designed or orderedScope Change/Add
48Tool / PedestalO4 - Vendor/Supplier IssueAETradeAll Sites2.4 Workflow (ROD-Instruction)Equipment supplied, not as designed or orderedScope Change/Add
49ToolO5 - Layout UpdateTradeAEAll Sites2.1 Workflow (ROD)Change request or notification driven by Layout changeScope Change/Add
50ToolO5 - Layout UpdateAETradeAll Sites2.4 Workflow (ROD-Instruction)Change request or notification driven by Layout changeScope Change/Add